Skip to main content

Content

    Home

    Main navigation

    • Latest NDP

      Hintergrundmaterial

      Learn all about the latest status of the Network Development Plan Electricity and the requirements for the electricity transmission grid in a climate-neutral Germany.
      Learn more here
      • NDP 2037/2045 (2025)
    • Background

      Hintergrundmaterial

      The reliable supply of electricity in Germany depends on a high-performance power grid consisting of power lines, substations, control centres and various technical facilities. More information on how the grid functions can be found here.
      Learn more here
      • Process and players
      • Planning and demand
      • Glossary (special terms)
    • Participation

      Hintergrundmaterial

      Participation processes play a central role in the creation of the NDP and in the subsequent planning steps. Share your concerns regarding the many different aspects of the development of the extra-high voltage grid.
      Learn more here
      • Participation opportunities
    • Archive

      Hintergrundmaterial

      The Network Development Plan is updated every two years in order to bring it in line with technological, political and social developments. Take a look at the past Network Development Plans.
      Learn more here
      • Network Development Plans Electricity
    Search
    MenüClose

    Please enter your search here:

    • de /
    • en

    Meta-Navigation

    • Press
    • Newsletter
    • Contact
    • Login

    Subnavigation (Main)

    • Latest NDP

      Hintergrundmaterial

      Learn all about the latest status of the Network Development Plan Electricity and the requirements for the electricity transmission grid in a climate-neutral Germany.
      Learn more here
      • NDP 2037/2045 (2025)
    • Background

      Hintergrundmaterial

      The reliable supply of electricity in Germany depends on a high-performance power grid consisting of power lines, substations, control centres and various technical facilities. More information on how the grid functions can be found here.
      Learn more here
      • Process and players
      • Planning and demand
        • Future-ready grids
        • Grid expansion measures
        • Offshore grid development
      • Glossary (special terms)
    • Participation

      Hintergrundmaterial

      Participation processes play a central role in the creation of the NDP and in the subsequent planning steps. Share your concerns regarding the many different aspects of the development of the extra-high voltage grid.
      Learn more here
      • Participation opportunities
    • Archive

      Hintergrundmaterial

      The Network Development Plan is updated every two years in order to bring it in line with technological, political and social developments. Take a look at the past Network Development Plans.
      Learn more here
      • Network Development Plans Electricity
        • NDP 2037/2045 (2023)
        • NDP 2035 (2021)
        • NDP 2030 (2019)
        • NDPs 2030 (2017)
        • NDPs 2025
        • NDPs 2024
        • NDPs 2023
        • NDP 2022

    Breadcrumb

    Home Mediathek
    • Latest NDP
    • Background
    • Participation
    • Archive

    Mediathek

    Downloads

    Präsentation: Einblick in die Umsetzung des Szenariorahmens
    03/06/2015
    [ PDF | 1.14 MB ]
    Präsentation: Einblick Marktsimulationsergebnisse
    03/06/2015
    [ PDF | 694.42 KB ]
    Präsentation: Offshore-Netzentwicklungsplan 2014
    18/11/2014
    [ PDF | 21.51 KB ]
    Präsentation: Netzentwicklungsplan 2014
    18/11/2014
    [ PDF | 21.37 KB ]
    Präsentation: Regionalisierung von Anlagen zur Energieerzeugung auf Basis regenerativer Energiequellen
    06/02/2014
    [ PDF | 1.15 MB ]
    Präsentation: Wesentliche Einflussgrößen für die Marktsimulation
    06/02/2014
    [ PDF | 1.17 MB ]
    Präsentation: Einleitung, Verfahren, Gestaltungsmöglichkeiten
    06/02/2014
    [ PDF | 294.59 KB ]
    Präsentation: Ausgestaltung Szenarien
    06/02/2014
    [ PDF | 824.93 KB ]
    Präsentation: Netzentwicklungsplan 2013 - Erkentnisse aus der Konsultation
    23/07/2013
    [ PDF | 1.02 MB ]
    Präsentation: Offshore-Netzentwicklungsplan 2013
    23/07/2013
    [ PDF | 455.56 KB ]
    Präsentation: Sensitivitätenbericht 2013 - Einflussgrößen auf die Netzentwicklung
    23/07/2013
    [ PDF | 785.22 KB ]
    Präsentation: Mögliche Sensitivitäten zu Szenarien des NEP
    06/02/2013
    [ PDF | 21.4 KB ]

    Pagination

    • First page « First
    • Previous page ‹ Previous
    • Current page 1
    • Page 2
    • Next page ››
    • Last page Last »

    Footer Menu

    • Latest NDP
      • NDP 2037/2045 (2025)
    • Background
      • Process and players
      • Future-ready grids
      • Grid expansion measures
      • Offshore grid development
      • Glossary (special terms)
    • Participation
      • Participation opportunities
    • Archive
    • NEP Logo

    Footer quick links

    • Press
    • Newsletter
    • Contact
    • Accessibility
    • Report a Barrier
    • Privacy Policy
    • Imprint
    © 2025, NEP