Skip to main content

Content

    Home

    Main navigation

    • Latest NDP

      Latest NDP

      Learn all about the latest status of the Network Development Plan Electricity and the requirements for the electricity transmission grid in a climate-neutral Germany.
      Learn more here
      • NDP 2037/2045 (2025)
    • Background

      Background

      The reliable supply of electricity in Germany depends on a high-performance power grid consisting of power lines, substations, control centres and various technical facilities. More information on how the grid functions can be found here.
      Learn more here
      • Process and players
      • Planning and demand
      • Glossary (special terms)
    • Participation

      Participation

      Participation processes play a central role in the creation of the NDP and in the subsequent planning steps. Share your concerns regarding the many different aspects of the development of the extra-high voltage grid.
      Learn more here
      • Participation opportunities
    • Archive

      Archive

      The Network Development Plan is updated every two years in order to bring it in line with technological, political and social developments. Take a look at the past Network Development Plans.
      Learn more here
      • Network Development Plans Electricity
    Search
    MenüClose

    Please enter your search here:

    • de /
    • en

    Meta-Navigation

    • Press
    • Newsletter
    • Contact
    • Login

    Subnavigation (Main)

    • Latest NDP

      Latest NDP

      Learn all about the latest status of the Network Development Plan Electricity and the requirements for the electricity transmission grid in a climate-neutral Germany.
      Learn more here
      • NDP 2037/2045 (2025)
    • Background

      Background

      The reliable supply of electricity in Germany depends on a high-performance power grid consisting of power lines, substations, control centres and various technical facilities. More information on how the grid functions can be found here.
      Learn more here
      • Process and players
      • Planning and demand
        • Future-ready grids
        • Grid expansion measures
        • Offshore grid development
      • Glossary (special terms)
    • Participation

      Participation

      Participation processes play a central role in the creation of the NDP and in the subsequent planning steps. Share your concerns regarding the many different aspects of the development of the extra-high voltage grid.
      Learn more here
      • Participation opportunities
    • Archive

      Archive

      The Network Development Plan is updated every two years in order to bring it in line with technological, political and social developments. Take a look at the past Network Development Plans.
      Learn more here
      • Network Development Plans Electricity
        • NDP 2037/2045 (2023)
        • NDP 2035 (2021)
        • NDP 2030 (2019)
        • NDPs 2030 (2017)
        • NDPs 2025
        • NDPs 2024
        • NDPs 2023
        • NDP 2022

    Breadcrumb

    Home Hintergrund - Netzentwicklungsplan 2030, Version 2019 Hintergrund - Netzentwicklungsplan Strom 2030, Version 2019, 2. Entwurf

    Er­mitt­lung des Po­ten­zi­als von Power-to-X-An­wen­dun­gen für die Netz­pla­nung (zu Ka­pi­tel 2.5.1)

    Kapitelübersicht

    • Flexibilisierung der Kraft-Wärme-Kopplung (zu Kapitel 2.3)
    • Re­gio­na­li­sie­rung des Aus­baus der Er­neu­er­ba­ren En­er­gi­en (zu Ka­pi­tel 2.4.1)
    • Sektorale Nachfrageenergiemengen je Bundesland (zu Kapitel 2.5)
    • Er­mitt­lung des Po­ten­zi­als von Power-to-X-An­wen­dun­gen für die Netz­pla­nung (zu Ka­pi­tel 2.5.1)
    • Ent­wick­lung der re­gio­na­len Strom­nach­fra­ge und Last­pro­fi­le zum Netz­ent­wick­lungs­plan Strom (zu Ka­pi­tel 2.5.1)
    • Vor­ge­hens­wei­se zur Be­stim­mung der Län­ge von Netz­an­bin­dungs­sys­te­men (zu Ka­pi­tel 3.2.3)
    • Markt­mo­dell BID3 (zu Ka­pi­tel 4.1)
    • Grund­sät­ze für die Pla­nung des deut­schen Über­tra­gungs­net­zes (zu Ka­pi­tel 5.1.1 und 5.1.2)
    • Netz­ana­ly­sen (zu Ka­pi­tel 5.1.4, 5.3.6 und 5.5)
    • Kos­ten­schät­zun­gen (zu Ka­pi­tel 5.3.1 und 5.3.6)
    • Begleitdokument Systemstabilität (zu Kapitel 5.5)

    In diesem PDF finden Sie die Kurzstudie der Forschungsstelle für Energiewirtschaft (FfE) zur Ermittlung des Potenzials von PtX-Anwendungen für die Netzplanung der vier ÜNB.

    Kurzstudie: Power-to-X - Ermittlung des Potenzials von PtX-Anwendungen für die Netzplanung der deutschen ÜNB [ PDF | 11.4 MB ]

    Footer Menu

    • Latest NDP
      • NDP 2037/2045 (2025)
    • Background
      • Process and players
      • Future-ready grids
      • Grid expansion measures
      • Offshore grid development
      • Glossary (special terms)
    • Participation
      • Participation opportunities
    • Archive
    • NEP Logo

    Footer quick links

    • Press
    • Newsletter
    • Contact
    • Privacy Policy
    • Imprint
    © 2025, NEP